Huge Crane to Lift New Bike-Ped Bridge Into Place

What- A 100-foot crane will hoist a prefabricated 90-foot bridge deck onto the support structure for a new bicycle-pedestrian bridge over Amazon Creek. Images from a prior lift are attached for reference.

Background- LTD is building two new bicycle-pedestrian bridges this year as part of the West Eugene EmX project. The bridges, plus a third bridge to be built next year by the City of Eugene, are funded through a $2.9 million ConnectOregon V grant. This investment will allow residents who live south of Amazon Creek to easily connect to West 11thAvenue businesses and the West Eugene EmX service that will launch next fall. The bridges also enhance Fern Ridge Path and the rest of the path system for recreational walking and bicycling.

When– Thursday, October 27, 2016. Be in position by 12:00 p.m. (Noon). The crane lift is expected to occur between 12:15 p.m. and 12:30 p.m.

Where- Just West of Acorn Park on the Fern Ridge Path. If driving you may park along the street on Buck Street or West 13th Avenue.

ltd-bikebridge-map

Author: Shane MacRhodes

Contributor & co-editor. Papa. Active Transportation Professional. BEST Board Member.